Urethane cement and epoxy systems for Burlington food plants, breweries, bakeries, dairies, meat and produce processors and commercial kitchens. Seamless, coved to the wall, sloped to drain and built to survive daily hot washdown.

Free on-site assessment, usually within days because we are based here in Burlington. Written scope, fixed price, no obligation.

5.0 ★27 Google reviews
1.2M+Sq ft installed
5-YearWarranty
FreeOn-site assessment
The cost of leaving it

What a failing food plant floor is already costing you.

Nobody budgets for a floor until it turns into an audit finding or an unplanned shutdown. By then it is the most expensive line item in the building, and it is on somebody else's timetable rather than yours.

A finding you have to close on their clock

A cracked slab, an open wall junction or a drain throat that has been eaten out reads as a finding. Remediating under a corrective action deadline costs a multiple of doing the same work on your own schedule.

Recoating every three years

Standard epoxy specified into a hot washdown area is a recurring operating cost pretending to be a capital project. Three recoats cost more than one urethane cement system that was right the first time.

Water and product travelling under the floor

Once a coating debonds at a drain or a wall junction, washdown drives water underneath it. You cannot clean what you cannot reach, and the failure spreads sideways from that point on.

A wet room with no traction left in it

A cook line floor polished smooth by years of scrubbing is a claim waiting to happen, and the lost time is the smallest part of that bill.

With four hundred plus food and beverage businesses in Burlington, we see this failure more here than anywhere else, and it is almost always the same two places: the drain throat and the wall junction. The middle of the floor is usually fine, which is good news for what it costs to fix.

One unplanned shutdown almost always costs more than the floor would have.

Burlington, specifically

Burlington is the food and beverage capital of the three cities we serve.

Invest Burlington counts over 400 food and beverage businesses employing more than 7,800 people, with Sofina Foods and Voortman Cookies both in the city's top five private employers and Cargill Canada, Pinty's, Earth Fresh Foods and the Chicken Farmers of Ontario head office all here as well. That concentration is why more of our washdown and urethane cement work lands in Burlington than anywhere else. It also means the buildings run the full range, from 1960s Harvester Road stock with hard-troweled slabs and no vapour retarder, to newer plants on the 407 Corridor where green concrete is the constraint instead.

QEW CorridorHarvester RoadMainwayNorth Service RoadBronte Creek Meadows407 CorridorAldershot / 403 WestAppleby Line

Most requested in Burlington: urethane cement in wet process and bottling areas.

Harvester Road and the North Service Road stock dates to the 1960s through 1980s, which usually means a hard-troweled slab with no vapour retarder under it and decades of soaked-in product. The 407 Corridor and Bronte Creek Meadows are Burlington's newest inventory, where green concrete and slab moisture are the risk instead.

Because we are based in Burlington, most of our food and beverage work here starts with a same-week walk-through, and that matters more than it sounds. The single most useful hour on a plant floor is the one where we look at your drains, your washdown routine and where the floor has already failed, before anyone writes a number down. Nine times out of ten the failure is at the drain throat or the wall junction rather than in the middle of the floor, which changes the scope completely and usually reduces it.

Systems we specify

Wet process, dry process and cold: three different floors.

A food facility is not one floor. The cook line, the packaging hall and the blast freezer each punish concrete differently, and specifying one system across all of it is how plants end up recoating in three years.

SystemWhere it goesWhy it gets specified
Urethane cement, 6 to 12 mmCook lines, washdown bays, blast freezers, bottling and CIP areasManufacturer data puts a 6 mm build at roughly -25°C to +80°C and a 12 mm build at -40°C to +130°C, with occasional spillage to 150°C. That is why boiling washdown does not lift it the way it lifts standard epoxy.
Self-levelling urethane cement, 4 to 6 mmDry process, packaging, warehouse sideSeamless and cleanable, tough enough for pallet and forklift traffic, without paying for a full trowelled mortar where you do not need one.
Broadcast quartz epoxyPrep rooms, coolers, corridorsTexture is built into the system rather than sprinkled on top, so the slip profile survives scrubbing.
Novolac epoxy topcoatFermentation, pickling, acid and CIP chemical zonesNovolac resists inorganic acids well past where standard bisphenol-A epoxy gives up, including concentrated sulfuric exposure on published product data.
Integral cove base, 100 mmEvery wall and floor junction, plinths and equipment basesRemoves the 90 degree corner that product, water and biofilm collect in. This is the single most common thing we find missing on an existing plant floor.
Diamond grind + moisture testPrime / scratch coatBody coat 4 to 12 mmIntegral coveSlope to drainSeal + texture

Built for washdown, not just spills

Steam, caustic, hot oils and animal fats will find every weakness in a floor. Published resistance data on urethane cement systems covers 50% acetic acid, concentrated lactic acid at 60°C and 100% oleic acid at 60°C. The failure mode with ordinary epoxy is rarely chemistry anyway, it is thermal movement: epoxy expands at a different rate than the slab, and a boiling washdown cycle shears the bond. Cementitious urethane moves much closer to the concrete underneath it.

Book a Site Visit

Written to support your preventive control plan

The Safe Food for Canadians Regulations, section 57, require floors that are smooth, non-absorbent and impervious to moisture, that provide or permit good drainage, and surfaces capable of withstanding repeated cleaning and sanitizing. We specify to that language and hand you the manufacturer data sheets for your PCP file. What we will not do is tell you a floor is CFIA certified, because no such certification exists, and the USDA non-food compounds acceptance programme ended in 1998. Any plant being told otherwise is being sold something.

Read the Guides

Installed around your production schedule

We work nights, weekends and shutdown windows, and we section the plant so one line keeps running while another is down. Standard urethane cement grades take traffic within about 24 hours at 8°C, and rapid grades in roughly 5 hours at 10°C, which is what makes a weekend changeover realistic.

See Pricing

Want to know what your Burlington floor would actually cost?

We are local, so the assessment is normally days away rather than weeks. We test the slab, write the scope and give you a fixed price, and you are not committing to anything by finding out.

Detailing

What we build into a food & beverage floor.

Slope and drainage

Falls to drain generally run between 1:100 and 1:80. Channels go near equipment, never underneath it, with prefabricated profiles at the channel edges.

Slip resistance that is honest

ANSI A326.3 sets 0.42 wet DCOF for interior wet areas and 0.55 where oils and greases are present. We build cook lines and wet process to 0.55, and we will tell you plainly that the standard itself says DCOF does not predict whether someone slips.

Thermal shock zones

Blast freezer thresholds, retort areas, steam kettles and rack washers all get a thicker build than the room around them.

Coving and equipment bases

Cove up the wall, cove up the plinth, seal the interface. Cleanable geometry beats a cleanable coating.

Crack and joint detailing

Moving joints get honoured through the system, not buried under it. Buried joints telegraph and split within a season.

Colour zoning

Allergen zones, raw versus RTE separation and traffic aisles marked into the floor rather than taped onto it.

Working in Burlington

What a Burlington job actually looks like.

Burlington is our home base, which in practice means a shorter lead time and easier site visits than anywhere else we work. The industrial stock along Harvester Road, Mainway and the North Service Road is mature and generally straightforward to get into, with real dock access and room to stage. What catches people out here is the slab, not the schedule: a lot of these floors have been sealed, patched, painted and re-sealed over forty years, and all of that has to come off before anything new goes down.

01

Same-week site visit

Being based in Burlington means we can usually get eyes on the floor within days rather than weeks, and take moisture readings on the same visit.

02

Strip back to sound concrete

Old coatings, sealers and shake-on hardeners are removed mechanically to the profile the new system needs. This is the step that decides whether the floor lasts.

03

Phased install, written warranty

We work in sections around your hours, then hand over data sheets, a maintenance sheet and a 5-year warranty on the installed system.

1:80Typical fall to drain
130°CUrethane cement top of range
0.55Wet DCOF we target
~5 hrsRapid grade back in service
Recent work

Floors we have installed across the GTA.

Twenty-seven Google reviews, a 5.0 average, and Christopher replies to every one of them personally. Being based in Burlington also means the people who quoted your floor are the people who show up to install it.

5.0
★★★★★
27 verified reviews on Google
Read Reviews on Google
★★★★★

"I had the pleasure of working with Surface Coating Experts, owned by Christopher, on a project in our condominium where one of the balconies and walkways required a complete repair."

Valerie T.Google review
★★★★★

What customers mention most: garage floor installation, epoxy quality, detailed work, and a smooth process from first quote to finished floor.

Across 27 reviewsVerified on Google
★★★★★

Every review gets a personal reply from the owner - the after-the-job care that keeps the rating a perfect 5.0.

Christopher replies personallyOwner-operated
No cost, no obligation

The Free On-Site Floor Assessment.

This is not a sales call with a clipboard. Burlington is our home base, so the assessment is quick to arrange and we already know the building stock: Harvester Road and North Service Road floors that have been sealed, patched and re-sealed for forty years, and 407 Corridor buildings where the concrete is still green. Both are workable. Both need testing first.

  • We walk wet process, dry process and cold separatelyThey need three different systems and only one of them is expensive. Specifying the costly one across the whole plant is the most common way food facilities overpay for a floor.
  • Moisture and bond testing on your actual slabASTM F1869 calcium chloride and ASTM F2170 in-situ relative humidity, plus a bond test on anything contaminated. On older Burlington industrial stock we are usually looking at what is under three decades of previous coatings, and that is a test, not a guess.
  • A written scope, not a number on the back of a cardSystem, build thickness, preparation method and the phasing plan, in writing. That includes how much of the old floor has to come off, which on Harvester Road is frequently the biggest single item in the job.
  • A fixed price with the preparation itemisedStripping, grinding and repair get their own lines rather than disappearing into a rate per square foot. It is the honest way to price it and it is the only way to compare two quotes properly.
  • An honest answer, including noIf a densify and seal does what you need, we will quote that instead of a full system. And if the slab has had enough, we would rather say so than put a five-year warranty on top of a problem.

Free. No obligation. Usually within the week.

Prefer to talk it through? Call (905) 876-6957, Monday to Saturday, 6am to 6pm.

Book your free assessment

Tell us where the floor is and what runs on it. We will come out, test it and put a fixed price in writing.

No obligation. We reply the same working day.
FAQ

Food & Beverage floor questions, Burlington.

Do we have to shut the whole plant down?
No. We section the facility and work nights, weekends and scheduled shutdowns so one line keeps running while another is down. Standard urethane cement grades take traffic within about 24 hours at 8°C and rapid grades in roughly 5 hours at 10°C, which is what makes a weekend changeover workable.
Why urethane cement instead of regular epoxy?
Heat. Epoxy and concrete expand at different rates, so a boiling washdown or a steam clean-down puts a shear load on the bond and eventually pops it. Cementitious urethane moves much closer to the slab and manufacturer data supports service to 120°C or 130°C depending on build thickness, with occasional spillage to 150°C.
Is the floor antimicrobial?
We are careful with that word. In Canada, unqualified antimicrobial claims on treated articles are restricted, and some systems only carry registered mould and mildew resistance for the dried film. The real food safety gain is that the floor is seamless and coved, so there is nowhere for product to sit in the first place.
Can you tie into our existing drains and trenches?
Yes. We terminate into drain throats and channel edges with prefabricated profiles, re-establish falls where the slab has settled and rebuild the throat itself if it has been eaten out. That interface is where most food plant floors actually fail.
Do you work on Harvester Road and the North Service Road plants?
Constantly. That is the oldest food and beverage stock in Burlington and it comes with the classic problems: no under-slab vapour retarder, decades of product driven into the concrete and drains that have been eaten out at the throat. We test moisture, degrease, and rebuild the drain interfaces rather than coating up to them.
We run a brewery. Is that different from a food plant?
The wet side is similar and the acid side is not. Fermentation, CIP chemistry and cleaning acids push you toward novolac topcoats in specific zones, while the bottling and packaging floor is a straightforward urethane cement job. Burlington has enough craft production that this is a regular conversation for us.
Our floor keeps failing in the same spot. Why?
Almost always because of a detail rather than the coating. The three usual culprits are the drain throat, the wall junction where there is no cove, and a moving joint that was coated over instead of honoured through the system. Fixing the detail costs a fraction of recoating the whole room, and we will tell you when that is all you actually need.
We got a cheaper quote. What is the difference?
Usually the preparation and the system. A cheaper food plant quote is often standard epoxy where urethane cement belongs, no integral coving, and no moisture testing. That floor will look identical on handover day and be lifting at the drains inside two years. Ask both of us three questions: what thickness, what happens at the wall junction, and did you test the slab. The answers will explain the gap.
Can we just patch the bad areas instead?
Sometimes, and we will tell you when. If the failure is at a drain throat or a wall junction and the field of the floor is sound, a detail repair is a fraction of a full recoat and it is what we would recommend. If the coating is debonding across the field, patching is money spent twice.
What happens if it fails?
The installed system carries a 5-year warranty and Christopher, the owner, is on your job rather than a rotating crew. Beyond the paperwork, the reason we test slabs before quoting is that we would rather lose a quote than warranty a floor over concrete we do not believe in.

Same service nearby: Food & Beverage in Oakville  ·  Food & Beverage in Hamilton

Two honest notes on timing.

We are based in Burlington, so the assessment itself is usually days away rather than weeks. What takes real time is materials on a specialist system, and the mitigation step if the slab tests wet. Getting the testing done early does not commit you to anything, it just means the date you eventually pick is a date we can actually hold.

More in Burlington

Other facilities we coat in Burlington.

Also see our industrial & commercial overview, epoxy flooring in Burlington and published pricing.

Book your free food & beverage floor assessment in Burlington.

We are based in Burlington, so a site visit is usually days away rather than weeks. Tell us the square footage and what the floor has to survive, and we will test it and price it properly.

Free, no obligation, and you keep the written scope whether you use us or not.