Serving Oakville, Burlington, Milton, Hamilton, the GTA & Niagara
★★★★★ 5.0 · 27 Google reviewsMon–Sat 6am–6pm(905) 876-6957
Home / Industrial & Commercial / Electronics & ESD Milton
Milton · Electronics & ESD

ESD & Electronics Floor Coatings in Milton

Static dissipative and conductive floor systems for Milton electronics manufacturers, PCB and assembly operations, data centres and battery facilities. Grounded, installed as a system and resistance tested on handover.

Free on-site assessment, usually within the week. Milton is a short drive from our Burlington base. Written scope, fixed price, no obligation.

5.0 ★27 Google reviews
1.2M+Sq ft installed
5-YearWarranty
FreeOn-site assessment
The cost of leaving it

What an ungrounded or unverified ESD floor is costing you.

This is the one category where the damage is usually invisible, which is exactly why it goes unfixed for years.

Damage nobody traces back

Electrostatic damage is frequently latent. The part passes test, fails in the field, and the warranty claim never gets connected to the floor it was assembled on.

A qualification you cannot evidence

If the floor was never tested to ANSI/ESD S7.1 and you hold no resistance results, your compliance verification plan has a hole in it that an auditor will find before you do.

Anti-static that was never a system

A dissipative coating with no grounding grid and no earth points measures nothing useful. A lot of facilities are paying for an ESD floor they do not actually have.

Dust in a data hall

Bare slab under a raised access floor sheds continuously into equipment that is spending energy filtering it back out.

Milton's electrical and controls operations are mostly in newer buildings, which makes the grounding easier to get right and the slab easier to get wrong. A dissipative floor over a wet slab fails like any other, and the earth path only works if it was designed in before the primer.

The floor is a small number next to one field failure you cannot explain.

Milton, specifically

Milton's electronics work is mostly electrical and controls, and it is growing.

Eaton and Schneider Electric are both named by InvestMilton in the town's business parks, and the Town reports professional, scientific and technical services employment up more than a third since 2021. That is not yet the electronics cluster Burlington has, but it is a real base of electrical, controls and test operations that need a static-dissipative floor with a reliable earth path. Because so much of Milton's stock is new, the good news is that the grounding is usually designed in before the primer goes down rather than retrofitted into a building with forty years of electrical modifications.

401 Business ParkDerry Green Corporate Business ParkJames Snow ParkwaySteeles AvenueMarket DriveNipissing RoadSixth Line / Derry RoadHigh Point Drive

Most requested in Milton: static-dissipative epoxy with grounding designed into new construction.

The 401 Business Park along Steeles Avenue, Market Drive and Nipissing Road is Milton's original industrial stock, built from the 1970s into the 1990s, which usually means a decent slab that has been sealed, patched and painted several times and never tested for moisture. Derry Green is the opposite problem: much of it was poured in the last three years, and green concrete with high slab moisture is the thing that kills a coating there.

Most of the Milton ESD work we quote is in a building new enough that the grounding can be designed properly from the start. We still ask for a qualified electrical engineer to specify the earth linkage, because that is the part of an ESD floor that a coating contractor should not be improvising.

Systems we specify

A number on a data sheet is not compliance.

ANSI/ESD S20.20 does not care what the coating tin says. It asks for a flooring and footwear system measuring under 1.0 x 10⁹ ohms and a peak body voltage under 100 V. Both. A dissipative coating installed without a grounding grid meets neither, and that is the most common ESD floor failure we get called in to fix.

SystemWhere it goesWhy it gets specified
Static dissipative epoxyEPA workstations, assembly, PCB handling, test areasDissipative sits above 1.0 x 10⁶ and below 1.0 x 10⁹ ohms resistance to ground. Typically 2 to 3 mm, foot traffic at 24 hours, heavy traffic at 48, full cure at 7 days.
Conductive epoxyHigher risk areas, explosives-adjacent, some battery workConductive is 1.0 x 10⁶ ohms and below. A lower resistance is not automatically better, it is a different design decision, and it has electrical safety implications.
Copper grounding grid and earth pointsUnderneath the whole systemCopper tape bridging joints, tied to earth points installed with redundancy. Manufacturer guidance calls for a minimum of two earth points per floor area so a single failure does not orphan the floor.
Standard high-build epoxyData centre halls, corridors, non-EPA areasNot everything needs to be ESD. Sealing bare slab under and around a raised access floor kills dust without paying for a grounded system where you do not need one.
Handover resistance testingEvery ESD installPoint-to-point and point-to-groundable-point testing per ANSI/ESD S7.1, with results documented for your compliance verification plan.
Moisture test→Shot blast→Conductive primer→Copper grid + earth points→Dissipative body coat→S7.1 resistance test

Grounded as a system, not coated as a surface

The floor is one element in a grounded path. We install a conductive primer, lay copper tape bridging the joints, tie into earth points placed with redundancy, and have the earth linkage cabling specified by a qualified electrical engineer rather than guessed at. A dissipative coating rolled over bare concrete with no grid is not an ESD floor, whatever the data sheet says.

Book a Site Visit

Tested and documented at handover

ANSI/ESD S7.1 characterises floor material resistance point-to-point and point-to-groundable-point, both under 1.0 x 10⁹ ohms for S20.20. We test at completion and hand you the results. S20.20 also requires a compliance verification plan with periodic retesting, and the interval is set by your facility rather than by the standard, so we will not invent one for you.

Read the Guides

What we will not claim

We do not sell ESD S20.20 certified floors, because S20.20 certifies a facility's ESD control programme, not a coating and not a contractor. What we install is a floor that can be qualified within your programme, tested and documented. We also avoid the word anti-static: it is not a standardised term, it usually just means reduced tribocharging, and it has no verified resistance range or ground path behind it.

See Pricing

Want to know what your Milton floor would actually cost?

We test the slab, write the scope and give you a fixed price. On a new building that includes the moisture reading nobody else takes, and you are not committing to anything by finding out.

Detailing

What we build into a electronics & esd floor.

Resistance bands, stated properly

Conductive is 1.0 x 10⁶ ohms and below. Dissipative is above 1.0 x 10⁶ and below 1.0 x 10⁹. Test method is ASTM F150 and ANSI/ESD S7.1.

Body voltage matters too

S20.20 requires peak body voltage under 100 V per ANSI/ESD STM97.2, measured with the footwear in use. Resistance alone is not compliance.

Raised access floors

In a data centre the coated slab often sits under a raised floor whose stringers and pedestals carry their own grounding. We coordinate rather than assume.

Dust control under the floor

Sealing bare concrete beneath a raised access floor is one of the highest value, lowest cost jobs in a data hall.

Cart and trolley abrasion

Loaded server carts are harder on a floor than anything else in the building, so abrasion resistance drives the topcoat choice.

Coordination with your ESD coordinator

We work to the spec your programme sets. If you do not have one yet, we will tell you that the floor is only one element of it.

Working in Milton

What a Milton job actually looks like.

Milton is the fastest-growing employment base we work in. The Town reports jobs up roughly a quarter since 2020 and close to two million square feet of new industrial space added in 2025 alone, most of it in Derry Green. That shapes the work: in the 401 Business Park we are usually stripping forty years of old sealers off a sound slab, and in Derry Green we are usually waiting on, or mitigating, a slab that is still giving off moisture. Both are routine. Neither should be guessed at.

01

Site visit and slab moisture test

We come out from Burlington, walk the floor with you, and take calcium chloride or in-situ RH readings on the same visit. On a new Derry Green slab this single test decides the system and the schedule.

02

Prep to the profile the system needs

Old sealers, hardeners and paint come off mechanically in the older units. New slabs are ground to open the surface and remove curing compound, which is the most common cause of a coating letting go on new construction.

03

Phased install, written warranty

We work in sections around receiving hours or a plant shutdown, then hand over data sheets, a maintenance sheet and a 5-year warranty on the installed system.

<1×10⁹ ΩS20.20 system limit
<100 VPeak body voltage
2Minimum earth points
48 hrsHeavy traffic, typical
Recent work

Floors we have installed across the GTA.

Twenty-seven Google reviews, a 5.0 average, and Christopher replies to every one of them personally. Milton is close enough to Burlington that the people who quote your floor are the people who install it.

5.0
★★★★★
27 verified reviews on Google
Read Reviews on Google
★★★★★

"I had the pleasure of working with Surface Coating Experts, owned by Christopher, on a project in our condominium where one of the balconies and walkways required a complete repair."

Valerie T.Google review
★★★★★

What customers mention most: garage floor installation, epoxy quality, detailed work, and a smooth process from first quote to finished floor.

Across 27 reviewsVerified on Google
★★★★★

Every review gets a personal reply from the owner - the after-the-job care that keeps the rating a perfect 5.0.

Christopher replies personallyOwner-operated
No cost, no obligation

The Free On-Site Floor Assessment.

This is not a sales call with a clipboard. Milton has two very different kinds of building and we price them differently: 401 Business Park units where the cost is in stripping what previous owners put down, and Derry Green buildings where the cost is in dealing honestly with a slab that is still curing. Both are workable. Both need testing first.

  • We map the EPA boundary with you before pricing anythingGrounded systems get priced only where they are genuinely required, with a sealed high-build epoxy everywhere else. On a large floor that split is a very large number.
  • Moisture and bond testing on your actual slabASTM F1869 calcium chloride and ASTM F2170 in-situ relative humidity, plus a bond test on anything previously coated. On new Milton construction we do this before anything else, because a wet slab under a coating is a warranty claim waiting to happen.
  • A written scope, not a number on the back of a cardSystem, build thickness, preparation method and the phasing plan, in writing. If the slab needs a mitigation primer, that is a named line with a reason, not a surprise on the invoice.
  • A fixed price with the preparation itemisedGrinding, stripping, repair and any mitigation get their own lines rather than disappearing into a rate per square foot. It is the only way to compare two quotes properly.
  • An honest answer, including noIf a new slab needs another month before it is ready, we will say so rather than coat it and hope. And if a densify and seal does what you need, we will quote that instead of a full system.

Free. No obligation. Usually within the week.

Prefer to talk it through? Call (905) 876-6957, Monday to Saturday, 6am to 6pm.

Book your free assessment

Tell us where the floor is and what runs on it. We will come out, test it and put a fixed price in writing.

No obligation. We reply the same working day.
FAQ

Electronics & ESD floor questions, Milton.

What does ANSI/ESD S20.20 actually require of a floor?
Two things together. The flooring and footwear system has to measure under 1.0 x 10⁹ ohms, tested per ANSI/ESD STM97.1, and peak body voltage has to stay under 100 V per STM97.2. Meeting the resistance figure alone is not compliance, which is where most installed ESD floors fall down.
Is anti-static flooring the same thing?
No. Anti-static is not a standardised term. It usually just means the surface generates less charge through contact and separation, with no verified resistance range and no ground path. It does not satisfy S20.20. If a quote says anti-static without a resistance figure and a grounding detail, it is not an ESD floor.
Can you certify our floor to S20.20?
No, and neither can any flooring contractor. S20.20 certifies a facility's ESD control programme, not a coating. What we do is install a grounded system that can be qualified inside your programme, test it to ANSI/ESD S7.1 at handover and give you the documentation. Certification of the programme itself is a separate exercise.
Do we need conductive or dissipative?
Usually dissipative, which sits above 1.0 x 10⁶ and below 1.0 x 10⁹ ohms. Conductive, at 1.0 x 10⁶ and below, is a specific design decision for higher risk areas and carries electrical safety implications of its own. Lower resistance is not automatically safer, and your ESD coordinator should be making that call, not your flooring contractor.
What do you hand over at the end of an ESD install?
Resistance test results measured per ANSI/ESD S7.1, point-to-point and point-to-groundable-point, plus the manufacturer data sheets and the grounding layout showing where the earth points are. We will not hand you a certificate saying the floor is S20.20 certified, because no such thing exists. Compliance needs both a resistance under one billion ohms and body voltage under one hundred volts, and we test for the first and tell you how to verify the second.
Our building is new. Does that make ESD flooring easier?
Yes, on the grounding, and no, on the slab. New construction lets us specify earth points and the copper grid before anything is installed, which is the cheap way to do it. But a new slab is often still wet, and a dissipative system over a wet slab will fail like any other. We test moisture first.
When does the grounding design need to be settled?
Before the primer goes down, not after. Earth point locations, grid layout and cabling routes all sit underneath the finished system, so retrofitting them means cutting into a floor you have just paid for. On new Milton construction this is easy to get right if it is decided early.
The other quote is much cheaper and says it is ESD.
Then ask two questions: what resistance range is being guaranteed, and where are the earth points. A dissipative coating with no conductive primer, no copper grid and no grounding is a coloured floor, and it is a lot cheaper to quote. ANSI/ESD S20.20 needs the system under 1.0 x 10⁹ ohms and peak body voltage under 100 V. If a quote does not mention either number, it is not quoting an ESD floor.
Do we have to shut the EPA down for a week?
No. Typical systems take foot traffic at 24 hours and heavy traffic at 48, with full cure at 7 days, and we work in sections around your production. What does need planning ahead is the grounding: earth points and the grid sit underneath the finished floor, so those get settled before the primer goes down.
What do we get at handover?
Resistance test results measured per ANSI/ESD S7.1, point-to-point and point-to-groundable-point, plus the grounding layout showing where the earth points are, the manufacturer data sheets and the warranty. That is what your compliance verification plan actually needs on file.

Same service nearby: Electronics & ESD in Oakville  ·  Electronics & ESD in Burlington

Two honest notes on timing.

Milton is twenty minutes up Highway 25 from our base in Burlington, so the assessment itself is quick to arrange. What takes real time is a new slab that tests wet, which is common in Derry Green: either the concrete is given more time to dry, or a moisture mitigation primer goes down first and adds a day and a material cost. Testing early costs nothing and it means the date you pick is one we can actually hold.

More in Milton

Other facilities we coat in Milton.

Also see our industrial & commercial overview, epoxy flooring in Milton and published pricing.

Book your free electronics & esd floor assessment in Milton.

Tell us the square footage, what runs on the floor and whether the building is new or one of the original Steeles Avenue units. On new Milton slabs we test moisture before anything else, because that is what decides the system.

Free, no obligation, and you keep the written scope whether you use us or not.

CallFree Assessment