Serving Oakville, Burlington, Milton, Hamilton, the GTA & Niagara
★★★★★ 5.0 · 27 Google reviewsMon–Sat 6am–6pm(905) 876-6957
Home / Industrial & Commercial / Electronics & ESD Hamilton
Hamilton · Electronics & ESD

ESD & Electronics Floor Coatings in Hamilton

Static dissipative and conductive floor systems for Hamilton electronics manufacturers, PCB and assembly operations, data centres and battery facilities. Grounded, installed as a system and resistance tested on handover.

Free on-site assessment across Hamilton, Stoney Creek, Ancaster, Dundas and Mount Hope. Written scope, fixed price, no obligation.

5.0 ★27 Google reviews
1.2M+Sq ft installed
5-YearWarranty
FreeOn-site assessment
The cost of leaving it

What an ungrounded or unverified ESD floor is costing you.

This is the one category where the damage is usually invisible, which is exactly why it goes unfixed for years.

Damage nobody traces back

Electrostatic damage is frequently latent. The part passes test, fails in the field, and the warranty claim never gets connected to the floor it was assembled on.

A qualification you cannot evidence

If the floor was never tested to ANSI/ESD S7.1 and you hold no resistance results, your compliance verification plan has a hole in it that an auditor will find before you do.

Anti-static that was never a system

A dissipative coating with no grounding grid and no earth points measures nothing useful. A lot of facilities are paying for an ESD floor they do not actually have.

Dust in a data hall

Bare slab under a raised access floor sheds continuously into equipment that is spending energy filtering it back out.

In Hamilton the areas are bigger, so the mistakes cost more. Specifying a grounded system across a whole data hall or manufacturing floor when only part of it is an EPA is one of the largest avoidable numbers we see in this category.

The floor is a small number next to one field failure you cannot explain.

Hamilton, specifically

Hamilton's ESD work is data halls, batteries and advanced manufacturing.

ICT and digital media are among the sectors Invest in Hamilton promotes, with the West Hamilton Innovation District and McMaster Innovation Park anchoring the research end, while the Red Hill business parks and Ancaster carry advanced manufacturing. In practice our Hamilton static-control work splits three ways: server rooms and data halls where the real win is sealing the slab under a raised access floor to kill dust, battery and energy storage operations where the grounding requirement is genuine, and manufacturing cells where dust or solvent vapour brings bonding into scope. Three different jobs that get lumped together under one acronym.

Bayfront IndustrialStoney Creek Business ParkRed Hill Business ParkAncaster Business ParkAirport Employment Growth DistrictEast HamiltonFlamborough Business ParkDundas Industrial

Most requested in Hamilton: sealed slabs under raised floors and grounded manufacturing cells.

Hamilton has the oldest industrial building stock of the three. Bayfront and East Hamilton slabs are frequently mid-century, poured without a vapour retarder, finished with a shake-on hardener and carrying decades of oil and coolant. That is a prep problem before it is a coating problem. Red Hill, Ancaster and the airport lands are newer and far more straightforward.

Hamilton also gives us the largest floor areas of the three cities for this kind of work, and area changes the economics. Over a big data hall or a large manufacturing cell, the difference between sealing the slab and installing a fully grounded system is a very large number, so getting the zoning right is worth real money. We map the areas that genuinely need a grounded system, seal the rest properly, and put both lines in the quote so the decision is yours to make with the numbers in front of you.

Systems we specify

A number on a data sheet is not compliance.

ANSI/ESD S20.20 does not care what the coating tin says. It asks for a flooring and footwear system measuring under 1.0 x 10⁹ ohms and a peak body voltage under 100 V. Both. A dissipative coating installed without a grounding grid meets neither, and that is the most common ESD floor failure we get called in to fix.

SystemWhere it goesWhy it gets specified
Static dissipative epoxyEPA workstations, assembly, PCB handling, test areasDissipative sits above 1.0 x 10⁶ and below 1.0 x 10⁹ ohms resistance to ground. Typically 2 to 3 mm, foot traffic at 24 hours, heavy traffic at 48, full cure at 7 days.
Conductive epoxyHigher risk areas, explosives-adjacent, some battery workConductive is 1.0 x 10⁶ ohms and below. A lower resistance is not automatically better, it is a different design decision, and it has electrical safety implications.
Copper grounding grid and earth pointsUnderneath the whole systemCopper tape bridging joints, tied to earth points installed with redundancy. Manufacturer guidance calls for a minimum of two earth points per floor area so a single failure does not orphan the floor.
Standard high-build epoxyData centre halls, corridors, non-EPA areasNot everything needs to be ESD. Sealing bare slab under and around a raised access floor kills dust without paying for a grounded system where you do not need one.
Handover resistance testingEvery ESD installPoint-to-point and point-to-groundable-point testing per ANSI/ESD S7.1, with results documented for your compliance verification plan.
Moisture testShot blastConductive primerCopper grid + earth pointsDissipative body coatS7.1 resistance test

Grounded as a system, not coated as a surface

The floor is one element in a grounded path. We install a conductive primer, lay copper tape bridging the joints, tie into earth points placed with redundancy, and have the earth linkage cabling specified by a qualified electrical engineer rather than guessed at. A dissipative coating rolled over bare concrete with no grid is not an ESD floor, whatever the data sheet says.

Book a Site Visit

Tested and documented at handover

ANSI/ESD S7.1 characterises floor material resistance point-to-point and point-to-groundable-point, both under 1.0 x 10⁹ ohms for S20.20. We test at completion and hand you the results. S20.20 also requires a compliance verification plan with periodic retesting, and the interval is set by your facility rather than by the standard, so we will not invent one for you.

Read the Guides

What we will not claim

We do not sell ESD S20.20 certified floors, because S20.20 certifies a facility's ESD control programme, not a coating and not a contractor. What we install is a floor that can be qualified within your programme, tested and documented. We also avoid the word anti-static: it is not a standardised term, it usually just means reduced tribocharging, and it has no verified resistance range or ground path behind it.

See Pricing

Want to know what your Hamilton floor would actually cost?

On older Hamilton slabs the preparation is the whole variable, so we test before we price. Book the assessment and you get a fixed number rather than an estimate that moves once the grinder starts.

Detailing

What we build into a electronics & esd floor.

Resistance bands, stated properly

Conductive is 1.0 x 10⁶ ohms and below. Dissipative is above 1.0 x 10⁶ and below 1.0 x 10⁹. Test method is ASTM F150 and ANSI/ESD S7.1.

Body voltage matters too

S20.20 requires peak body voltage under 100 V per ANSI/ESD STM97.2, measured with the footwear in use. Resistance alone is not compliance.

Raised access floors

In a data centre the coated slab often sits under a raised floor whose stringers and pedestals carry their own grounding. We coordinate rather than assume.

Dust control under the floor

Sealing bare concrete beneath a raised access floor is one of the highest value, lowest cost jobs in a data hall.

Cart and trolley abrasion

Loaded server carts are harder on a floor than anything else in the building, so abrasion resistance drives the topcoat choice.

Coordination with your ESD coordinator

We work to the spec your programme sets. If you do not have one yet, we will tell you that the floor is only one element of it.

Working in Hamilton

What a Hamilton job actually looks like.

Hamilton jobs get more preparation time in the quote than anywhere else we work, and that is deliberate. The Bayfront and East Hamilton building stock is old, hard-used and frequently contaminated, and the honest way to price that is to test before quoting rather than discover it on day two. The Red Hill business parks, Ancaster and the Mount Hope airport lands are newer and much more predictable, and we price those accordingly rather than applying a Hamilton premium across the board.

01

Test before we price it

Moisture testing, a bond test on contaminated slabs and a look for shake-on hardeners. On older Hamilton floors this is the difference between a real quote and a guess.

02

Preparation priced honestly

Degreasing, shot blasting and repair are itemised rather than buried, so you can see what you are paying for and why the cheap quote is cheap.

03

Install in sections

Bay by bay, line by line, on nights and weekends. Fast-cure systems return traffic to a finished section in as little as 4 hours.

<1×10⁹ ΩS20.20 system limit
<100 VPeak body voltage
2Minimum earth points
48 hrsHeavy traffic, typical
Recent work

Floors we have installed across the GTA.

Twenty-seven Google reviews, a 5.0 average, and Christopher replies to every one of them personally. On the kind of floors Hamilton has, an owner-operated crew that tests before it quotes is worth more than a bigger name.

5.0
★★★★★
27 verified reviews on Google
Read Reviews on Google
★★★★★

"I had the pleasure of working with Surface Coating Experts, owned by Christopher, on a project in our condominium where one of the balconies and walkways required a complete repair."

Valerie T.Google review
★★★★★

What customers mention most: garage floor installation, epoxy quality, detailed work, and a smooth process from first quote to finished floor.

Across 27 reviewsVerified on Google
★★★★★

Every review gets a personal reply from the owner - the after-the-job care that keeps the rating a perfect 5.0.

Christopher replies personallyOwner-operated
No cost, no obligation

The Free On-Site Floor Assessment.

This is not a sales call with a clipboard. Hamilton has the oldest industrial building stock we work in, and the honest way to quote a Bayfront or East Hamilton floor is to test it rather than look at it. That is why our Hamilton assessments take longer than most, and why our Hamilton prices tend to hold.

  • We map the EPA boundary with you before pricing anythingGrounded systems get priced only where they are genuinely required, with a sealed high-build epoxy everywhere else. On a large floor that split is a very large number.
  • Moisture and bond testing on your actual slabASTM F1869 calcium chloride and ASTM F2170 in-situ relative humidity, plus a bond test wherever there is contamination or a shake-on hardener. On mid-century Hamilton slabs there is usually both, and neither shows up until you test for it.
  • A written scope, not a number on the back of a cardSystem, build thickness, preparation method and the phasing plan, in writing, including what happens if the bond test comes back poor. Knowing that answer up front is what stops a job turning into a negotiation halfway through.
  • A fixed price with the preparation itemisedDegreasing, shot blasting and repair are listed separately rather than buried. On a Hamilton floor that is often the majority of the cost, and you deserve to see it rather than discover it.
  • An honest answer, including noWe have walked away from Hamilton slabs that needed structural work before they needed a coating, and told the owner exactly that. If sealing what you have is the better spend this year, that is what we will quote.

Free. No obligation. Usually within the week.

Prefer to talk it through? Call (905) 876-6957, Monday to Saturday, 6am to 6pm.

Book your free assessment

Tell us where the floor is and what runs on it. We will come out, test it and put a fixed price in writing.

No obligation. We reply the same working day.
FAQ

Electronics & ESD floor questions, Hamilton.

What does ANSI/ESD S20.20 actually require of a floor?
Two things together. The flooring and footwear system has to measure under 1.0 x 10⁹ ohms, tested per ANSI/ESD STM97.1, and peak body voltage has to stay under 100 V per STM97.2. Meeting the resistance figure alone is not compliance, which is where most installed ESD floors fall down.
Is anti-static flooring the same thing?
No. Anti-static is not a standardised term. It usually just means the surface generates less charge through contact and separation, with no verified resistance range and no ground path. It does not satisfy S20.20. If a quote says anti-static without a resistance figure and a grounding detail, it is not an ESD floor.
Can you certify our floor to S20.20?
No, and neither can any flooring contractor. S20.20 certifies a facility's ESD control programme, not a coating. What we do is install a grounded system that can be qualified inside your programme, test it to ANSI/ESD S7.1 at handover and give you the documentation. Certification of the programme itself is a separate exercise.
Do we need conductive or dissipative?
Usually dissipative, which sits above 1.0 x 10⁶ and below 1.0 x 10⁹ ohms. Conductive, at 1.0 x 10⁶ and below, is a specific design decision for higher risk areas and carries electrical safety implications of its own. Lower resistance is not automatically safer, and your ESD coordinator should be making that call, not your flooring contractor.
Does a server room floor need to be ESD?
Often not, and this is where money gets wasted. In a lot of data halls the highest value job is simply sealing the bare concrete under and around the raised access floor to stop it dusting, plus an abrasion resistant surface where loaded carts run. If a grounded system is genuinely required, the raised floor's own stringers and pedestals carry grounding too, so it has to be coordinated rather than assumed.
We are handling powders. Does that change things?
Yes, it moves you from ESD into combustible dust territory, which is a different and more serious specification. NFPA 660 now consolidates the combustible dust standards, and hazardous location bonding and grounding also sits under the Canadian Electrical Code. That is an engineered design, and the floor is one element of it rather than the answer to it.
Can you quote both options so we can compare?
Yes, and on a large floor we would insist on it. We map the zones that genuinely need a grounded system, price those properly, and price a sealed high-build epoxy for everything else. Over a big data hall or manufacturing floor the gap between the two is significant, and you should be making that call with real numbers rather than a single blended rate.
The other quote is much cheaper and says it is ESD.
Then ask two questions: what resistance range is being guaranteed, and where are the earth points. A dissipative coating with no conductive primer, no copper grid and no grounding is a coloured floor, and it is a lot cheaper to quote. ANSI/ESD S20.20 needs the system under 1.0 x 10⁹ ohms and peak body voltage under 100 V. If a quote does not mention either number, it is not quoting an ESD floor.
Do we have to shut the EPA down for a week?
No. Typical systems take foot traffic at 24 hours and heavy traffic at 48, with full cure at 7 days, and we work in sections around your production. What does need planning ahead is the grounding: earth points and the grid sit underneath the finished floor, so those get settled before the primer goes down.
What do we get at handover?
Resistance test results measured per ANSI/ESD S7.1, point-to-point and point-to-groundable-point, plus the grounding layout showing where the earth points are, the manufacturer data sheets and the warranty. That is what your compliance verification plan actually needs on file.

Same service nearby: Electronics & ESD in Burlington  ·  Electronics & ESD in Oakville

Two honest notes on timing.

On older Hamilton slabs the preparation is the variable, and we would much rather find that at the assessment than halfway through your job. Second, plant, hangar and warehouse shutdown windows get booked early here. If you have a date in mind, the useful move is to get us in front of the floor well ahead of it.

More in Hamilton

Other facilities we coat in Hamilton.

Also see our industrial & commercial overview, epoxy flooring in Hamilton and published pricing.

Book your free electronics & esd floor assessment in Hamilton.

Tell us the square footage, what runs on the floor and what has already been tried on it. On older Hamilton slabs we test before we price, so the number you get is the number.

Free, no obligation, and you keep the written scope whether you use us or not.

CallFree Assessment