Serving Oakville, Burlington, Milton, Hamilton, the GTA & Niagara
★★★★★ 5.0 · 27 Google reviewsMon–Sat 6am–6pm(905) 876-6957
Home / Industrial & Commercial / Electronics & ESD Burlington
Burlington · Electronics & ESD

ESD & Electronics Floor Coatings in Burlington

Static dissipative and conductive floor systems for Burlington electronics manufacturers, PCB and assembly operations, data centres and battery facilities. Grounded, installed as a system and resistance tested on handover.

Free on-site assessment, usually within days because we are based here in Burlington. Written scope, fixed price, no obligation.

5.0 ★27 Google reviews
1.2M+Sq ft installed
5-YearWarranty
FreeOn-site assessment
The cost of leaving it

What an ungrounded or unverified ESD floor is costing you.

This is the one category where the damage is usually invisible, which is exactly why it goes unfixed for years.

Damage nobody traces back

Electrostatic damage is frequently latent. The part passes test, fails in the field, and the warranty claim never gets connected to the floor it was assembled on.

A qualification you cannot evidence

If the floor was never tested to ANSI/ESD S7.1 and you hold no resistance results, your compliance verification plan has a hole in it that an auditor will find before you do.

Anti-static that was never a system

A dissipative coating with no grounding grid and no earth points measures nothing useful. A lot of facilities are paying for an ESD floor they do not actually have.

Dust in a data hall

Bare slab under a raised access floor sheds continuously into equipment that is spending energy filtering it back out.

Burlington has the real electronics cluster of the three cities, and the recurring problem here is buildings whose electrical infrastructure has been rebuilt several times. The coating is rarely the issue. Getting a reliable, redundant earth path in a forty-year-old building is.

The floor is a small number next to one field failure you cannot explain.

Burlington, specifically

Burlington has the strongest electronics cluster of the three cities.

Evertz Microsystems is one of Burlington's top five private employers, and ON Semiconductor, Semtech and SITA Canada are all in the city as well, alongside electrical and clean tech names like Eaton and ABB. That is a genuine electronics base, and it is why more of our grounded floor work happens in Burlington than in Oakville or Hamilton. The buildings along Harvester Road, Mainway and the North Service Road are mature, so the recurring technical problem is not the coating, it is getting a reliable earth path in a building whose electrical infrastructure has been modified five times since it was built.

QEW CorridorHarvester RoadMainwayNorth Service RoadBronte Creek Meadows407 CorridorAldershot / 403 WestAppleby Line

Most requested in Burlington: dissipative epoxy with retrofitted grounding grids.

Harvester Road and the North Service Road stock dates to the 1960s through 1980s, which usually means a hard-troweled slab with no vapour retarder under it and decades of soaked-in product. The 407 Corridor and Bronte Creek Meadows are Burlington's newest inventory, where green concrete and slab moisture are the risk instead.

In Burlington we do enough of this work to have a standing view on the most common mistake, which is treating the grounding as a detail at the end. The earth points, the grid layout and the cabling route need to be decided before the primer goes down, because retrofitting them afterwards means cutting into a finished floor. On a live building with modified electrical infrastructure that coordination takes a day of somebody's time up front and saves considerably more than that later.

Systems we specify

A number on a data sheet is not compliance.

ANSI/ESD S20.20 does not care what the coating tin says. It asks for a flooring and footwear system measuring under 1.0 x 10⁹ ohms and a peak body voltage under 100 V. Both. A dissipative coating installed without a grounding grid meets neither, and that is the most common ESD floor failure we get called in to fix.

SystemWhere it goesWhy it gets specified
Static dissipative epoxyEPA workstations, assembly, PCB handling, test areasDissipative sits above 1.0 x 10⁶ and below 1.0 x 10⁹ ohms resistance to ground. Typically 2 to 3 mm, foot traffic at 24 hours, heavy traffic at 48, full cure at 7 days.
Conductive epoxyHigher risk areas, explosives-adjacent, some battery workConductive is 1.0 x 10⁶ ohms and below. A lower resistance is not automatically better, it is a different design decision, and it has electrical safety implications.
Copper grounding grid and earth pointsUnderneath the whole systemCopper tape bridging joints, tied to earth points installed with redundancy. Manufacturer guidance calls for a minimum of two earth points per floor area so a single failure does not orphan the floor.
Standard high-build epoxyData centre halls, corridors, non-EPA areasNot everything needs to be ESD. Sealing bare slab under and around a raised access floor kills dust without paying for a grounded system where you do not need one.
Handover resistance testingEvery ESD installPoint-to-point and point-to-groundable-point testing per ANSI/ESD S7.1, with results documented for your compliance verification plan.
Moisture testShot blastConductive primerCopper grid + earth pointsDissipative body coatS7.1 resistance test

Grounded as a system, not coated as a surface

The floor is one element in a grounded path. We install a conductive primer, lay copper tape bridging the joints, tie into earth points placed with redundancy, and have the earth linkage cabling specified by a qualified electrical engineer rather than guessed at. A dissipative coating rolled over bare concrete with no grid is not an ESD floor, whatever the data sheet says.

Book a Site Visit

Tested and documented at handover

ANSI/ESD S7.1 characterises floor material resistance point-to-point and point-to-groundable-point, both under 1.0 x 10⁹ ohms for S20.20. We test at completion and hand you the results. S20.20 also requires a compliance verification plan with periodic retesting, and the interval is set by your facility rather than by the standard, so we will not invent one for you.

Read the Guides

What we will not claim

We do not sell ESD S20.20 certified floors, because S20.20 certifies a facility's ESD control programme, not a coating and not a contractor. What we install is a floor that can be qualified within your programme, tested and documented. We also avoid the word anti-static: it is not a standardised term, it usually just means reduced tribocharging, and it has no verified resistance range or ground path behind it.

See Pricing

Want to know what your Burlington floor would actually cost?

We are local, so the assessment is normally days away rather than weeks. We test the slab, write the scope and give you a fixed price, and you are not committing to anything by finding out.

Detailing

What we build into a electronics & esd floor.

Resistance bands, stated properly

Conductive is 1.0 x 10⁶ ohms and below. Dissipative is above 1.0 x 10⁶ and below 1.0 x 10⁹. Test method is ASTM F150 and ANSI/ESD S7.1.

Body voltage matters too

S20.20 requires peak body voltage under 100 V per ANSI/ESD STM97.2, measured with the footwear in use. Resistance alone is not compliance.

Raised access floors

In a data centre the coated slab often sits under a raised floor whose stringers and pedestals carry their own grounding. We coordinate rather than assume.

Dust control under the floor

Sealing bare concrete beneath a raised access floor is one of the highest value, lowest cost jobs in a data hall.

Cart and trolley abrasion

Loaded server carts are harder on a floor than anything else in the building, so abrasion resistance drives the topcoat choice.

Coordination with your ESD coordinator

We work to the spec your programme sets. If you do not have one yet, we will tell you that the floor is only one element of it.

Working in Burlington

What a Burlington job actually looks like.

Burlington is our home base, which in practice means a shorter lead time and easier site visits than anywhere else we work. The industrial stock along Harvester Road, Mainway and the North Service Road is mature and generally straightforward to get into, with real dock access and room to stage. What catches people out here is the slab, not the schedule: a lot of these floors have been sealed, patched, painted and re-sealed over forty years, and all of that has to come off before anything new goes down.

01

Same-week site visit

Being based in Burlington means we can usually get eyes on the floor within days rather than weeks, and take moisture readings on the same visit.

02

Strip back to sound concrete

Old coatings, sealers and shake-on hardeners are removed mechanically to the profile the new system needs. This is the step that decides whether the floor lasts.

03

Phased install, written warranty

We work in sections around your hours, then hand over data sheets, a maintenance sheet and a 5-year warranty on the installed system.

<1×10⁹ ΩS20.20 system limit
<100 VPeak body voltage
2Minimum earth points
48 hrsHeavy traffic, typical
Recent work

Floors we have installed across the GTA.

Twenty-seven Google reviews, a 5.0 average, and Christopher replies to every one of them personally. Being based in Burlington also means the people who quoted your floor are the people who show up to install it.

5.0
★★★★★
27 verified reviews on Google
Read Reviews on Google
★★★★★

"I had the pleasure of working with Surface Coating Experts, owned by Christopher, on a project in our condominium where one of the balconies and walkways required a complete repair."

Valerie T.Google review
★★★★★

What customers mention most: garage floor installation, epoxy quality, detailed work, and a smooth process from first quote to finished floor.

Across 27 reviewsVerified on Google
★★★★★

Every review gets a personal reply from the owner - the after-the-job care that keeps the rating a perfect 5.0.

Christopher replies personallyOwner-operated
No cost, no obligation

The Free On-Site Floor Assessment.

This is not a sales call with a clipboard. Burlington is our home base, so the assessment is quick to arrange and we already know the building stock: Harvester Road and North Service Road floors that have been sealed, patched and re-sealed for forty years, and 407 Corridor buildings where the concrete is still green. Both are workable. Both need testing first.

  • We map the EPA boundary with you before pricing anythingGrounded systems get priced only where they are genuinely required, with a sealed high-build epoxy everywhere else. On a large floor that split is a very large number.
  • Moisture and bond testing on your actual slabASTM F1869 calcium chloride and ASTM F2170 in-situ relative humidity, plus a bond test on anything contaminated. On older Burlington industrial stock we are usually looking at what is under three decades of previous coatings, and that is a test, not a guess.
  • A written scope, not a number on the back of a cardSystem, build thickness, preparation method and the phasing plan, in writing. That includes how much of the old floor has to come off, which on Harvester Road is frequently the biggest single item in the job.
  • A fixed price with the preparation itemisedStripping, grinding and repair get their own lines rather than disappearing into a rate per square foot. It is the honest way to price it and it is the only way to compare two quotes properly.
  • An honest answer, including noIf a densify and seal does what you need, we will quote that instead of a full system. And if the slab has had enough, we would rather say so than put a five-year warranty on top of a problem.

Free. No obligation. Usually within the week.

Prefer to talk it through? Call (905) 876-6957, Monday to Saturday, 6am to 6pm.

Book your free assessment

Tell us where the floor is and what runs on it. We will come out, test it and put a fixed price in writing.

No obligation. We reply the same working day.
FAQ

Electronics & ESD floor questions, Burlington.

What does ANSI/ESD S20.20 actually require of a floor?
Two things together. The flooring and footwear system has to measure under 1.0 x 10⁹ ohms, tested per ANSI/ESD STM97.1, and peak body voltage has to stay under 100 V per STM97.2. Meeting the resistance figure alone is not compliance, which is where most installed ESD floors fall down.
Is anti-static flooring the same thing?
No. Anti-static is not a standardised term. It usually just means the surface generates less charge through contact and separation, with no verified resistance range and no ground path. It does not satisfy S20.20. If a quote says anti-static without a resistance figure and a grounding detail, it is not an ESD floor.
Can you certify our floor to S20.20?
No, and neither can any flooring contractor. S20.20 certifies a facility's ESD control programme, not a coating. What we do is install a grounded system that can be qualified inside your programme, test it to ANSI/ESD S7.1 at handover and give you the documentation. Certification of the programme itself is a separate exercise.
Do we need conductive or dissipative?
Usually dissipative, which sits above 1.0 x 10⁶ and below 1.0 x 10⁹ ohms. Conductive, at 1.0 x 10⁶ and below, is a specific design decision for higher risk areas and carries electrical safety implications of its own. Lower resistance is not automatically safer, and your ESD coordinator should be making that call, not your flooring contractor.
What do you hand over at the end of an ESD install?
Resistance test results measured per ANSI/ESD S7.1, point-to-point and point-to-groundable-point, plus the manufacturer data sheets and the grounding layout showing where the earth points are. That is what your compliance verification plan needs. We will not hand you a certificate saying the floor is S20.20 certified, because no such thing exists.
Our building's electrical has been rebuilt several times. Is grounding a problem?
It is the part that needs the most care. We install a minimum of two earth points per floor area for redundancy, and the earth linkage cabling is specified by a qualified electrical engineer rather than tied into whatever is nearest. In older Burlington industrial stock that coordination step matters more than the coating choice.
When does the grounding design need to be settled?
Before the primer goes down, not after. Earth point locations, grid layout and cabling routes all sit underneath the finished system, so retrofitting them means cutting into a floor you have just paid for. In an older building with modified electrical infrastructure that coordination is a day of work up front and it saves considerably more later.
The other quote is much cheaper and says it is ESD.
Then ask two questions: what resistance range is being guaranteed, and where are the earth points. A dissipative coating with no conductive primer, no copper grid and no grounding is a coloured floor, and it is a lot cheaper to quote. ANSI/ESD S20.20 needs the system under 1.0 x 10⁹ ohms and peak body voltage under 100 V. If a quote does not mention either number, it is not quoting an ESD floor.
Do we have to shut the EPA down for a week?
No. Typical systems take foot traffic at 24 hours and heavy traffic at 48, with full cure at 7 days, and we work in sections around your production. What does need planning ahead is the grounding: earth points and the grid sit underneath the finished floor, so those get settled before the primer goes down.
What do we get at handover?
Resistance test results measured per ANSI/ESD S7.1, point-to-point and point-to-groundable-point, plus the grounding layout showing where the earth points are, the manufacturer data sheets and the warranty. That is what your compliance verification plan actually needs on file.

Same service nearby: Electronics & ESD in Oakville  ·  Electronics & ESD in Hamilton

Two honest notes on timing.

We are based in Burlington, so the assessment itself is usually days away rather than weeks. What takes real time is materials on a specialist system, and the mitigation step if the slab tests wet. Getting the testing done early does not commit you to anything, it just means the date you eventually pick is a date we can actually hold.

More in Burlington

Other facilities we coat in Burlington.

Also see our industrial & commercial overview, epoxy flooring in Burlington and published pricing.

Book your free electronics & esd floor assessment in Burlington.

We are based in Burlington, so a site visit is usually days away rather than weeks. Tell us the square footage and what the floor has to survive, and we will test it and price it properly.

Free, no obligation, and you keep the written scope whether you use us or not.

CallFree Assessment